Before the Dutch closed the Zuiderzee, Lorentz and his committee spent eight years calculating what would happen to tides on the other side of the dam.

Watercolor illustration of a long sea barrier separating rough blue water from calmer pale water.

On May 28, 1932, workers closed the final opening in the Afsluitdijk. A photograph in the Dutch National Archives records the last gap at the Vlieter. On one side of the new barrier lay the Wadden Sea. On the other, the former Zuiderzee was becoming an enclosed lake. The archival record identifies the closure.

The barrier stretched across roughly thirty kilometres of water. It would protect communities that had endured repeated floods and support an enormous land-reclamation project. The catastrophic flooding of 1916 had helped turn the scheme from a long-running proposal into government policy. Rijkswaterstaat, the Dutch water authority, recounts its construction.

But the tide still approached from the North Sea.

Before the closure, part of that moving water had entered the Zuiderzee. Now its route ended at the dam. Along the coasts outside the protected area, people needed to know how much higher the water might rise.

Tidal wave reflection

Incoming tide0Inlet

Estimates had varied wildly. The government appointed a committee in 1918, with physicist Hendrik Lorentz as its chair. He was sixty-five and much better known for work on electromagnetism than for predicting water levels around Dutch villages. Leiden's history describes the assignment and the disagreement it had to resolve.

The sea had to fit on paper

There was no previous closure exactly like this one to consult. The committee had to calculate the consequences of changing the coastline before anyone could observe them.

The Wadden Sea offered a useful simplification. Much of the water moved through deeper channels within a shallow region. Lorentz's team represented those channels as a connected network. For each stretch, they could track the amount of water passing through and the water level at its ends.

Every junction imposed an accounting rule. Water entering had to leave through the connected channels or accumulate nearby, raising the level. Every channel imposed a motion rule: a difference in water level pushed water along it, while friction resisted the movement.

Those rules connected the whole network. Changing one route altered flows elsewhere, which altered water levels, which then changed the forces driving the next flow. The calculation had to keep those effects consistent.

A dam changes how a periodically moving body of water responds to the incoming tide. The time taken for water to travel through a basin, reflect from boundaries, and return helps determine whether successive movements reinforce one another.

The closure changed that timing. The remaining basin could respond more strongly to the same tidal forcing. The committee needed to calculate the moving water, rather than divide a fixed volume between the spaces left on a map. A Delft engineering study explains the network calculation and predicted increase in tidal range.

Eight years of arithmetic

Even the simplified network was difficult to calculate by hand. Friction was one obstacle. Its resistance grew roughly with the square of speed, so a change in current produced a disproportionate change in resistance.

Lorentz replaced that difficult term with a more manageable one, chosen to preserve the energy lost over a tidal cycle. This let the team solve a simpler set of equations while retaining the frictional effect that mattered for the tide.

They first compared calculations with the existing sea. A method that couldn't reproduce its known behavior would offer little reason to trust a prediction for the altered coastline. Then they changed the mathematical boundary to represent the dam and calculated again.

Jo Thijsse, a young assistant, carried out much of the lengthy numerical work. The committee's report appeared in 1926, eight years after its appointment. Lorentz later admitted that his own attempts at the arithmetic had produced mistakes that others needed to redo.

When the gap finally closed in 1932, observations provided the test the committee had been waiting for. The predicted ordinary tidal changes proved close to the measurements. Storm effects were harder to predict; later analysis found that those estimates had been less accurate. The technical history distinguishes the successful tidal predictions from the underestimated storm effects.

Lorentz had died in 1928. He never saw the barrier completed. A set of locks in it bears his name.

The closure protected the shores behind the new barrier. Outside it, tides continued through channels whose behavior the committee had spent eight years calculating. Water-level observations could finally be compared with the predicted sea.